Lingyuan project was established on August 5, 2016, with a total heating area of about 7.91 million square meters. The thermal network control center includes data acquisition monitoring system (SCADA), video monitoring system and other 15 software systems. The project adopts Ethernet - based optical fiber special network to monitor the heat exchange station, the design of heat network control center can meet the control requirements of multiple heat source network at the different operation time.
This project adopted heating data acquisition monitoring system, heating network asset management subsystem, energy consumption real-time monitoring subsystem, energy analysis subsystem, the heat user information and charging management subsystem, room temperature acquisition subsystem, heat metering subsystem, enterprise resource management subsystem, GIS geographic information system, calling center management subsystem (customer service system), thermal pipe network leakage measurement, operation diagnostic subsystem, video monitoring system, the real-time record of the customer service subsystem, entrance guard and infrared alarm subsystem, heating network energy balance simulation system.
![凌源热力供热监控系统 凌源热力供热监控系统]()
![凌源热力供热监控系统 凌源热力供热监控系统]()